California Title 24 energy reports. Simplified.
Accurate, professionally prepared energy compliance documentation for ADUs, homes, multifamily and commercial projects across California — ordered online in minutes.
One platform for every project type
ADU
Detached, attached and JADU energy compliance.
- CF1R certificate of compliance (performance or prescriptive)
- Climate zone confirmation from site address
- Envelope, fenestration, HVAC and water-heating modeling
Residential
Single-family new homes, additions and alterations.
- CF1R certificate of compliance
- Performance or prescriptive path, whichever fits best
- Heat-pump baseline analysis under the 2025 code
Multifamily
Duplex, triplex, fourplex and low-rise multifamily.
- LMCC certificates of compliance (performance or prescriptive)
- Per-unit modeling and orientation analysis
- Ventilation and water-heating system review
Commercial
NRCC compliance for nonresidential projects.
- Scope review and quote
- NRCC envelope, mechanical and lighting forms as required
- Performance modeling where beneficial
Standard turnaround 2–3 business days after complete plans are received.
See your price in seconds
Choose the project type, size and delivery speed. Every line of the calculation is shown — the same configuration powers checkout.
Price your Title 24 report
Calculated from our published price configuration. No hidden fees — the final amount is confirmed at checkout.
From plans to permit-ready documents
- 01
Select your report
Pick the project type and see the price instantly.
- 02
Upload plans & details
Drag in PDFs or images and answer a few project questions.
- 03
We model & review
Your project is modeled in CEC-approved software and technically reviewed.
- 04
Receive your documents
Signed compliance forms by email, ready for your plan set.
A compliance process built like software
We replaced phone tag and email chains with a clear online process — so you always know the price, the status and what happens next.
See the full processStraightforward ordering
A guided form that only asks what your project type needs.
Transparent pricing
Itemized estimates from a published price configuration.
Technical review
Model inputs checked against your plans before delivery.
Responsive support
Plan-check comments? Included revisions keep you moving.
Built for the way California builds
Answers to Title 24 questions
Hello world!
Welcome to WordPress. This is your first post. Edit or delete it, then start writing!
Read · 4 minBuilding PermitsDocuments you need for a Title 24 report
A checklist of plans and information to send your energy consultant for a fast, accurate Title 24 report.
Read · 3 minResidential Energy Compliance2025 Energy Code: what changed for homes and ADUs
The 2025 California Energy Code took effect January 1, 2026. Here are the changes that matter most for residential projects.
Read · 4 minWhat is a Title 24 report?
A Title 24 report is the energy compliance documentation that shows a California building design meets the Energy Code (Title 24, Part 6). It is prepared from your plans, usually with CEC-approved modeling software, and submitted with the building permit application.
Learn more →What is a CF1R?
A CF1R is the Certificate of Compliance for single-family residential projects. It documents, at permit stage, that the design complies with the Energy Code — most often via the performance method (CF1R-PRF-01).
Learn more →What is an LMCC?
LMCC stands for Low-rise Multifamily Certificate of Compliance — the multifamily equivalent of the CF1R, used at permit stage for low-rise multifamily buildings.
Learn more →When is a Title 24 report required?
Generally for new conditioned buildings, additions, and alterations that affect the envelope or energy-using systems. Your building department decides the exact documentation it accepts.
Learn more →How much does a Title 24 report cost?
It depends on project type and size. Use our estimator for an instant, itemized figure; commercial projects are quoted individually.
Learn more →How long does it take?
Standard turnaround is 2–3 business days after we receive complete plans. Rush options may be available at checkout.
Learn more →Ready to get your Title 24 report?
Upload your plans in minutes. We’ll handle the modeling, the forms and the plan-check revisions.